SGVWC Engineering Support and Staff Augmentation Services

San Gabriel Valley Water Storage Tanks

Agency Name: San Gabriel Valley Water Company (SGVWC)  

Project City:Fontana, California

Key Dates: 2018 – 2019 (Completed)

Overall Project Budget:  $73.3 M (Spending Budget)

Project Delivery Method: Design-Bid-Build, Design-Build

Project Description:

O2EPCM was the Prime, and provided staff augmentation for professional engineering support on an as-needed basis for San Gabriel Valley Water Company’s (“San Gabriel”) Los Angeles County and Fontana Water Company Divisions. O2EPCM is the Prime on the project.

O2EPCM supported SGVWC with several tasks that included preparing detailed designs of water mains and pipelines, fire hydrants, water meters, pressurized reducing valves for new development, commercial and system upgrades for the City of Fontana and Greater Los Angeles area. Other tasks also included design of Firewater, Hydrants, PRV’s, Layout, detail design schematics for construction and site verification of design constructability.